Your new gas stove works perfectly from day one. No callbacks, no safety concerns, no wondering if it was installed correctly.
You get precise temperature control for better cooking results. Your gas line connections are secure and code-compliant. Your building management stays happy because all permits and paperwork are handled properly.
Most importantly, you avoid the stress of dealing with inexperienced contractors who don’t understand NYC’s complex requirements for gas appliance installation.
RB Mechanical has been installing gas stoves in Chelsea and throughout Manhattan since 1983. Bobby and his son Rob understand the unique challenges of working in Chelsea’s mix of pre-war co-ops and modern high-rises.
We know which buildings require DOB filings, which superintendents need specific paperwork, and how to navigate co-op board requirements without delays. This local knowledge saves you time and prevents the costly mistakes that out-of-area contractors often make.
Our family business approach means you get the owners on-site, not subcontractors who disappear when problems arise.
First, we assess your existing gas line and kitchen setup to ensure compatibility with your new stove. If you’re replacing a stove in the same location, the installation is typically straightforward.
Next, we handle all building requirements – permits, insurance certificates, and any DOB filings your building requires. You don’t chase paperwork or deal with building management.
Finally, we disconnect your old stove safely, install your new gas range with proper connections, and test everything thoroughly. We clean up completely and walk you through the operation of your new appliance before leaving.
Ready to get started?
Your gas stove installation includes all necessary gas line work, from simple connections to new line installations if needed. We work with both natural gas and propane systems common in Chelsea buildings.
For Chelsea residents, we understand the building-specific challenges like narrow hallways in pre-war buildings, freight elevator scheduling, and strict noise restrictions during installation hours. We coordinate delivery timing and access to minimize disruption.
Our service covers gas cooking ranges, built-in cooktops, and combination oven-range units. Each installation meets NYC building codes and includes proper ventilation considerations for your specific kitchen layout.
Yes, NYC building code requires all gas appliance installations be performed by a licensed master plumber. This isn’t optional – it’s the law due to the potentially dangerous nature of gas work.
Many big box stores use lowest-bid contractors who aren’t properly licensed for gas work in NYC. Using an unlicensed installer can void your insurance, violate building codes, and create serious safety hazards.
RB Mechanical holds the proper NYC master plumber license and carries full insurance coverage required for gas appliance installation work in Manhattan buildings.
Most Chelsea buildings require a certificate of insurance, copy of the master plumber’s license, and proof of DOB filing execution. Co-ops often add alteration agreements with security deposits and processing fees.
Some buildings require the scope of work reviewed by their engineer at your expense. Pre-war buildings may have additional requirements due to older gas line systems.
RB Mechanical handles all required paperwork and building coordination. We know which Chelsea buildings have specific requirements and ensure everything is submitted properly to avoid delays.
Installation costs vary based on your specific situation, building requirements, and whether new gas lines are needed. Simple replacement installations typically cost less than new line installations.
Building fees like alteration agreements and deposits are separate from installation costs and vary by building. Some co-ops charge $1,250 security deposits plus processing fees.
RB Mechanical provides detailed written estimates with no hidden charges. We often come in under our original estimate, unlike contractors who add surprise costs during the job.
Yes, we regularly work in Chelsea co-op buildings and understand the specific approval processes required. Each co-op has different requirements for alteration agreements and contractor documentation.
We coordinate directly with building management and provide all required insurance certificates, license documentation, and indemnification forms. This eliminates the back-and-forth that frustrates many co-op residents.
Our experience with Chelsea co-ops means we know which buildings allow weekend work, which require freight elevator reservations, and how to minimize disruption to neighbors during installation.
Inactive gas lines require inspection and often restoration before connecting a new stove. The gas supply may be shut off at the building level and require utility company involvement to reactivate.
This situation requires careful pressure testing, leak detection, and sometimes line replacement depending on the age and condition of existing pipes. DOB permits are typically required for reactivating dormant gas lines.
RB Mechanical handles the entire process including utility coordination, inspections, and any necessary line work to safely restore gas service to your kitchen.
Yes, we install all types of gas cooking appliances including freestanding ranges, slide-in ranges, built-in cooktops, and wall ovens. We work with all major brands and both natural gas and propane systems.
For Chelsea’s diverse housing stock, we’re experienced with everything from compact apartment-sized units to professional-grade ranges in larger kitchens. We handle both standard and high-BTU installations.
Each installation is customized for your specific appliance and kitchen layout, ensuring proper clearances, ventilation, and gas supply for optimal performance and safety.