The December 31, 2024 deadline for Staten Island Community District 1 has come and gone. If you own a building in Port Richmond and haven’t completed your gas piping inspection and GPS2 filing, the DOB isn’t waiting around. Notices of Deficiency started going out in January 2025. Formal Notices of Violation followed in January 2026. This isn’t a warning period anymore — it’s active enforcement.
For Port Richmond landlords, the stakes are more immediate than a $5,000 fine. Most buildings in this neighborhood were built between 1895 and 1925. That’s a century of gas infrastructure — accumulated modifications, aging pipe supports, and the kind of atmospheric corrosion that accelerates when you’re sitting close to the Kill Van Kull waterfront. A utility-triggered gas shutoff doesn’t just affect you. It affects your tenants, your rental income, and your legal standing as a landlord.
Getting compliant now — on your schedule, with a plumber who can inspect, repair, and walk you through the GPS2 filing — is a completely different situation than getting caught by ConEd or a DOB violation. One is manageable. The other isn’t.
We’ve been working in New York City’s buildings since 1983 — that’s four decades of navigating the DOB, managing older gas systems, and handling the kind of work that requires a licensed master plumber. We know Port Richmond’s building stock inside and out.
When you hire us, you get Bobby and Rob. Father and son. Both licensed master plumbers. Both personally on-site for every job. The GPS1 report that gets filed with your building’s name on it has our names on it too — and that matters when you’re dealing with a legal compliance document.
Port Richmond’s pre-war woodframes, older gas systems, and buildings that have changed hands multiple times with accumulated informal repairs — that’s exactly the work we’ve been doing for 40 years. We’ve been inside buildings like yours since the 1980s. That’s not something a newer company or an out-of-borough firm can replicate.
The process starts with a call. You describe your building — how many units, whether it’s mixed-use, roughly when it was built — and we give you a straightforward cost breakdown before anything else happens. No vague estimates, no surprises when the invoice arrives.
On inspection day, Bobby or Rob personally walks the building. We assess all exposed gas piping in common areas, boiler rooms, mechanical spaces, and any other shared areas — from the point where gas enters the building up to individual tenant spaces. For Port Richmond’s older woodframes, this often means taking a close look at pipe supports, checking for atmospheric corrosion (which moves faster in buildings near the Kill Van Kull waterfront due to humidity), and flagging anything that doesn’t meet current code. If there’s a mixed-use component — a storefront on Port Richmond Avenue with residential units above — the commercial space is now included in the inspection scope under the 2026 rule expansion, and that gets covered too.
After the inspection, you receive the GPS1 report within 30 days. From there, the GPS2 certification needs to be filed with the DOB within 60 days. We walk you through exactly what that filing requires. If deficiencies were found, repairs happen before the filing — handled by the same plumber who did the inspection, not a second contractor you have to find under deadline pressure. One engagement, start to finish.
Ready to get started?
Most plumbers will hand you a GPS1 report and consider their job done. What happens if they find something? You’re back to square one — calling around for a second contractor, getting new quotes, and trying to schedule repairs before the DOB correction deadline closes in. That’s not how we work.
The inspection covers everything LL152 requires: a visual examination of all exposed gas piping, electronic leak detection, corrosion assessment, pipe support verification, and documentation of any Abnormal Operating Conditions. For Port Richmond buildings specifically — many of which are two- and three-family woodframes with decades of modifications layered on top of each other — the inspection often turns up things previous owners never addressed. Broken supports, outdated materials, connections that were acceptable under older code but aren’t today. Finding these things during a scheduled inspection is the best-case scenario. It means you control the timeline for repairs.
If something is found, we handle the repairs directly. If your building is already past the December 31, 2024 CD1 deadline and you’ve received a Notice of Deficiency or Notice of Violation, we have specific experience with DOB violation removal — not just routine compliance work. The goal is the same either way: get your building fully compliant, documented correctly, and filed with the DOB so the exposure is behind you.
Missing the December 31, 2024 deadline for Staten Island Community District 1 means your building is currently out of compliance with Local Law 152. The DOB began issuing Notices of Deficiency in January 2025 for buildings that missed prior cycle deadlines, and formal Notices of Violation followed in January 2026. If you’ve received one of these notices, or you’re expecting one, the path forward is the same: get the inspection done, address any deficiencies found, and file the GPS2 certification with the DOB.
The civil penalty for non-compliance is $5,000 per violation — reduced from the original $10,000 figure you may have seen cited elsewhere. That penalty doesn’t go away on its own. The sooner you complete the inspection and filing, the sooner you stop accumulating exposure. We have experience with DOB violation removal, not just routine inspections, so if you’re already past the deadline and dealing with an active notice in Port Richmond, that’s exactly the situation we’re equipped to handle.
The inspection must be performed by a Licensed Master Plumber — that’s not a preference, it’s a legal requirement under the law. The DOB explicitly recommends that building owners verify the LMP’s license status on the DOB’s public database before hiring anyone. The GPS1 report, which is the official gas piping inspection report, must be signed and sealed by the LMP. If the person who inspected your building isn’t a licensed master plumber, that report isn’t valid, and your GPS2 filing won’t hold up.
This matters more than it might seem in a price-sensitive market like Port Richmond, where you’ll find a range of contractors offering gas work at varying price points. Not all of them hold the LMP credential. Before you hire anyone for an LL152 inspection, ask for their license number and look it up. Our licensed master plumbers are verifiable on the DOB’s public database, and our credentials have been current and active in New York City for over 40 years.
The inspection covers all exposed gas piping in common areas — boiler rooms, mechanical rooms, hallways, rooftops, and anywhere else gas piping runs through shared building space. It does not include piping inside individual apartments or tenant spaces, with one important update: as of February 2026, commercial tenant spaces are now included in the scope. If you own a mixed-use building on Port Richmond Avenue with a storefront at grade and residential units above, the commercial space needs to be inspected too.
For Port Richmond’s older woodframe buildings — most of which were built between 1895 and 1925 — the inspection typically pays close attention to atmospheric corrosion, which progresses faster in buildings near the Kill Van Kull waterfront due to elevated humidity. Inspectors rate corrosion on a scale, and Level 3 or Level 4 findings require pipe replacement. The inspection also checks pipe supports, looks for unauthorized connections, verifies proper shut-off valve tagging, and uses electronic equipment to detect any active leaks. Buildings this age often have layers of modifications from previous owners, and the inspection documents all of it.
These are two separate documents with two separate responsibilities. The GPS1 is the Gas Piping Periodic Inspection Report — this is what the licensed master plumber produces after completing the inspection. It documents everything found during the walkthrough and must be delivered to the building owner within 30 days of the inspection. The GPS1 is the inspector’s document; it’s signed and sealed by the LMP.
The GPS2 is the Gas Piping System Periodic Inspection Certification — and this one is the building owner’s legal obligation to file with the NYC DOB. It must be filed within 60 days of the inspection. As of early 2026, all GPS2 filings go through DOB NOW, the city’s digital portal — there are no more paper submissions. There’s also a $35 filing fee per GPS2 certification, which is new as of 2026. If your building has no gas piping, you still have a filing obligation: a registered design professional must certify the absence of gas piping, and there’s a separate $480 per BIN filing fee for that documentation. We walk building owners through the GPS2 process so the filing gets done correctly and on time.
Not necessarily — and this is one of the most common fears Port Richmond landlords bring to this conversation. Not every deficiency triggers a gas shutoff. The law distinguishes between Class 1 conditions, which are immediate hazards and do require the gas to be shut off until repairs are made, and Class 2 conditions, which are non-immediate issues that allow gas service to continue while corrections are made within a set timeframe.
The reality is that most inspections in older buildings turn up findings — but the majority of those findings are Class 2: a deteriorated pipe support, minor surface corrosion, an outdated fitting. These get documented, repaired on a scheduled timeline, and resolved without any disruption to your tenants. The scenario you’re trying to avoid is a Class 1 condition being discovered not during a scheduled inspection, but during an emergency — a ConEd safety response or a tenant complaint — where the gas gets shut off immediately and you’re scrambling for emergency repairs at the worst possible time. Scheduling the inspection proactively, with a plumber who can also handle repairs, is how you stay in control of that timeline.
Local Law 152 requires inspections every four years, on a rotating schedule based on community district. Port Richmond is in Staten Island Community District 1. The Cycle 2 deadline for CD1 buildings was December 31, 2024 — that deadline has already passed. If you completed your inspection and filed your GPS2 certification before that date, you’re currently compliant, and your next deadline will be December 31, 2028, when Cycle 3 begins for CD1 buildings.
If you missed the December 31, 2024 deadline, the four-year clock doesn’t reset your obligation — it just means you’re out of compliance for the current cycle while the next cycle is already approaching. There is one extension available per cycle: a 180-day extension that must be proactively requested from the DOB. That extension window has a process and a deadline of its own, so it’s not a simple automatic grace period. The cleanest path forward for any Port Richmond building owner who is currently non-compliant is to schedule the inspection now, get the GPS2 filed, and close out the exposure before it compounds further.
Other Services we provide in Port Richmond