Owners usually come to us wanting one thing: a new appliance connected, a line moved, a kitchen extended. On a building with history, there can be a step in front of that.
Altering a gas system without a Department of Buildings work permit is illegal, and unpermitted gas work can bring significant fines and a loss of service for the whole building. If an earlier alteration was caught and a penalty is outstanding, that penalty has to be cleared before a new permit can be issued.
So the sequence becomes: establish what has been filed, resolve what has not where it is blocking, then file and do the work you called about.
In Gravesend this comes up more than average, because the housing is mixed and much of it has been adapted. Row houses subdivided or with basements converted. Storefronts on Avenue U that have changed use several times. Larger buildings with decades of alterations and no single record.
The good news is that this is entirely workable when it is known at the start. It is only a problem when it is discovered after a schedule has been built on the assumption it does not exist.
RB Mechanical Plumbing and Heating is third generation and owner operated, licensed master plumbers working in New York City since 1983. We are on Staten Island’s south shore, a short run from Gravesend.
On a straightforward building, the value of a plumber is the plumbing. On a building with filing history, it is knowing what the Department of Buildings will want and in what order, and being able to say so before anyone has committed money to a timeline.
Four decades of permits and violation removals is what that knowledge is made of. It is also why we ask awkward questions at the first visit: what has been changed, when, and by whom. Not to catch anyone out, but because the answers decide the plan.
We establish the filing position and the condition of the existing system together. One tells us the sequence, the other tells us the scope.
Then the load: what is connected, what you are adding, and whether the service carries it. That decides whether this is a connection or an upsizing.
Then the filing, through DOB NOW: Build, because the Department of Buildings no longer accepts paper filings. Repair or replacement of existing equipment commonly runs under a self-permitted Limited Alteration Application. New installation is a fuller filing.
Then the work by a Licensed Master Plumber, the Department of Buildings inspection, and the Gas Authorization that lets the utility connect. We handle the filings and the inspection requests throughout.
Ready to get started?
While a Licensed Master Plumber is in your building, there are two other things worth settling.
Your Local Law 152 gas piping inspection deadline, if your building is in scope. Those deadlines are set by community district, and Gravesend spans three, so your neighbour’s date may not be yours. One and two family homes classified in Occupancy Group R-3 are generally exempt.
And the condition of the rest of the system, rather than only the part being altered. A pressure test while we are on site is cheap compared with a second visit, and it tells you whether the system you are adding to is sound.
Neither of those is us finding extra work. They are the two questions an owner usually wishes they had asked while someone qualified was already standing in the basement.
Usually yes, but possibly not first. If the old work has been caught and there is an outstanding work-without-permit penalty, that has to be cleared before any new permit is issued, including yours.
If it has not been caught, the position is different and we will talk you through the options honestly rather than deciding for you. Either way, raising it at the start is what keeps it manageable.
A load calculation: everything currently connected plus what you are adding, against what the service can carry. If the service is adequate, it is a connection. If it is not, it is an upsizing, which is a bigger filing and brings the utility into the schedule.
Anyone quoting without asking what else is on the system has not answered that question.
The load, usually, and the filing history. Commercial equipment draws much more than domestic, so the capacity question is sharper, and a storefront that has changed use several times is where unfiled alterations most often sit.
If a commercial kitchen with a range hood is involved, the fire suppression system is a separate licensed trade and the Department of Buildings Plumbing Unit checks that work before the utility supplies gas.
Not for the installation. Filings and permits work the same across the city.
It matters for your Local Law 152 gas piping inspection deadline, which is set by community district, and Gravesend spans three. Worth checking your own address on the Department of City Planning lookup rather than assuming your block’s date.
Only if they are or directly employ a Licensed Master Plumber. Gas piping work in New York City is restricted to LMPs, and this is one of the areas where the rule is strict rather than nominal.
Ask who holds the licence and check it on the Department of Buildings License Search. The Know Your Construction Professional tool also shows disciplinary history.
We will not give a date before seeing the building, because on a building with filing history the honest answer depends on what we find rather than on the pipe.
What we will do on the first visit is tell you which sequence you are in and what the constraint is likely to be. That is more useful than a number we would have to revise.